Skip to main content
Skip table of contents

Move the configured SharePoint folder for linked items

When something happens, move the configured SharePoint folder for each {linked item} to {this path} within the configured SharePoint folder for this item.

This automation allows you to move the configured SharePoint folder (for linked items) which have previously been created using an automation such as:

For example in a CRM workflow, there may be a configured SharePoint folder for each deal, and also one for each Project. When a deal is won, the SharePoint folder for the deal can then be moved into the new folder created for the linked project, but each of these folders will be accessible from within their respective boards.

Automation recipes

No automation recipes are supplied for this automation. You simply create your own custom automation recipe by clicking on the “+ Add automation” button in Automation center.

Screenshot 2025-02-24 at 22.11.34.png

This allows you maximum flexibility to use a trigger suitable to your unique workflow.

How the automation works

Here’s a walkthrough video to show how the automation works:

https://www.youtube.com/watch?v=0Rke3t4Ddlc

Automating CRM workflows: Moving deal folders to projects

In the example from the above video, we showed you an automation process for CRM systems that handles deal-to-project transitions, including folder management in SharePoint.

The existing setup

Deals board

  • For each item in the Deals board, We have a folder configured in SharePoint to store

  • Example deals are visible in our Deals board

Projects board

  • Whenever a deal is won, an item is automatically created in the Projects board

  • A corresponding folder is also created in SharePoint for each new project (or item in the Projects board).

The automation process

Stage change trigger

We've set up an automation that:

  1. Triggers when a deal's stage changes to "Won"

  2. Creates a corresponding item in the Projects board

  3. Connects the two boards/items together

Enhancing file accessibility

The challenge

While the current system works, we want to:

  • Access deal files directly from the project/item in the Projects board

  • Maintain organization while keeping files connected

The solution: Folder moving automation

We've created a button-triggered automation that:

  1. Moves the configured SharePoint folder for the connected item in the Deals board

  2. Places it in a /Deals subfolder within the project folder

  3. Maintains all existing connections

Automation details:

  • Trigger: "Move Deal Folder" button click

  • Action: Moves the configured SharePoint folder for each connected item

  • Destination: /Deals within the configured SharePoint folder for the item in the Projects board

Demonstration

When we click the "Move Deal Folder" button in projects:

  1. The automation runs

  2. The folder moves from its original location to:

    • A /Deals subfolder in the projects directory

  3. The files remain:

    • Accessible in their original location in the Deals board

    • Available within the new projects subfolder

Benefits

  • Maintains workflow organization

  • Keeps all files connected across boards

  • Allows access to deal documents from Projects board items

  • Preserves original access to the deal files in the Deals board while adding new access points

JavaScript errors detected

Please note, these errors can depend on your browser setup.

If this problem persists, please contact our support.